Down at 06:40. Signed off at 12:05.
The power goes at ten past six and the rest of the morning is on one card: who raised the fault, who was sent, which parts left the shelf, how long the machine was off and who tested it before it went back into service. Nobody reconstructs it afterwards from three phone calls.
- The callout list is ordered by what is actually down, not by who shouted
- Downtime is measured from the minute the fault was raised
- The card closes when a named person signs, not when everyone goes home
T. MoyoJC-1042 · GEN-01 will not crankOn site 07:20
P. NyoniJC-1039 · cold room running warmOn site 06:55
R. SibandaJC-1036 · forklift hydraulic leakIn workshop
Outside contractorJC-1031 · borehole pump rewindAwaiting quote
Out this morning: 4 — own staff and hired in.


